top of page

De Vere Wokefield Estate

Full decommission and strip out.

This was a full decommission and strip out of the existing steel heating system, steel hot water pipework and steel boosted cold water pipework.

Installing and zoning all new two pipe system back and through to the plant room, carrying out the required alterations to the existing plant room.

We then carried out a full re-pipe of the BWCS, HWS, HWR, SVP and waste pipework supplying en-suites.

Project Gallery

bottom of page